Use this document as the master checklist for deploying Northstar Show Systems at a new venue. Complete each section in order. Fill in venue-specific details in the tables below.

Venue information

FieldValue
Venue name
Location
Install date
Installer
Show file version
HelmOS version
NorthLink firmware version

Pre-install checklist

  • Helm mini PC provisioned with Windows 10/11 Pro, HelmOS installed as service
  • Travel router configured (SSID: TRUENORTH, subnet 10.0.0.0/24, DHCP 10.0.0.10–250)
  • Bridge assembled and tested (all 6 buttons + 6 LEDs verified)
  • All Polaris nodes flashed with NorthLink firmware and labeled per brand guide
  • nodes.json authored in Compose and validated with dry-run upload
  • Ethernet cable for Helm-to-router connection
  • USB A-to-C cable for Helm-to-Bridge connection
  • iPad charged with Cuemaster bookmarked at http://10.0.0.1:3000

IP assignment table

Record each node’s assigned IP and physical location:

Node NameVariantIP AddressBuilding / ZonePhysical Location
10.0.0.
10.0.0.
10.0.0.
10.0.0.
10.0.0.
10.0.0.
10.0.0.
10.0.0.
10.0.0.
10.0.0.

Power requirements

Document power source for each node and the Helm:

DevicePower SourceCircuit / OutletNotes
Helm
BridgeUSB from HelmN/A
Router

Cable run log

Run #FromToCable TypeLengthRoute Notes
1
2
3
4
5

Startup verification

  • Power on the travel router. Confirm TRUENORTH SSID is visible.
  • Power on Helm. Confirm static IP 10.0.0.1 on wired NIC.
  • Connect Bridge via USB. Confirm Server Running LED (D12) is solid.
  • Power on all Polaris nodes. Wait 30 seconds for DHCP and Wi-Fi association.
  • Open Cuemaster on iPad (http://10.0.0.1:3000). Confirm all nodes show as online (green).
  • Press Show Start on Bridge. Confirm Show Start LED (D8) lights and boot sequence fires.
  • Press Show Stop on Bridge. Confirm all sequences cancel and show state returns to STOPPED.
  • Press Show Reset on Bridge. Confirm 5-second reset window (yellow flash on D10), then STOPPED.
  • Turn maintenance key switch ON. Confirm Maintenance LED (D11) lights and Show Start is blocked.
  • Turn maintenance key switch OFF. Confirm normal operation resumes.

Sign-off

FieldValue
Install verified by
Date
Notes