Application Note: Themed Attraction
NORTHSTARSHOW SYSTEMS
Application Note: Themed Attraction
Multi-zone immersive walkthrough with Northstar
| Document Number | Revision | Date | Platform Version |
|---|---|---|---|
| NSSS-DOC-0102 | A | 2026-05-20 | 1.0 |
Scenario
A themed walkthrough attraction with 8 zones over a 2,000 m² floorplan, multiple media players for synchronised video, full surround audio per zone, and pneumatic show effects. Throughput: 1 group every 90 seconds, ~40 groups per hour.
Hardware Layout
- 8 Polaris GPIO Nodes — one per zone, each driving 8 to 10 effects
- 4 Polaris Audio Nodes — covers 8 zones with two channels each
- 4 Polaris Video Nodes — synchronised media playback at key reveal points
- 2 Polaris Bridge panels — primary at the control booth, secondary at the rear of the attraction for technicians
- Custom NEMA enclosures with PoE-to-USB-C splitters for clean cable routing
Synchronised Video
For multi-screen reveals (e.g., 3 projectors fading up together), use a single event-cue-complete chain rather than multiple manual triggers. Compose's Block Editor supports tight timing via the wait block down to single milliseconds; HelmOS dispatches UDP commands in parallel where possible.
Group Spacing
To prevent overlapping groups from triggering effects simultaneously, use input combos with held mode and timer-based reset cues. Example: "PIR triggered AND zone occupancy timer > 90s" — implemented as a combo hat with a held mode and a separate reset cue that clears the occupancy state.
Technician Access
A second Polaris Bridge panel in the back-of-house gives technicians access to Maintenance Mode without entering the show area during operation. Both Bridges share the same maintenance-key role; turning either one engages Maintenance.
Network Sizing
- Single enterprise AP for ~24 Polaris nodes plus 2 Cuemaster tablets — well within capacity
- Subnet /24 with static reservations for Helm, Bridges, and APs
- 5 GHz only on 80 MHz channel for the show network
Related Documents
- NSSS-DOC-0012TrueNorth Network Design
- NSSS-DOC-0014Scaling Guide
Revision History
| Revision | Date | Description |
|---|---|---|
| A | 2026-05-20 | Initial publication |